題 名 | Life Assessment for the First Stage Rotor Blades in the Gas Turbines on Nan-Pu Power Station=南火氣渦輪機第一級動葉片之壽命評估 |
---|---|
作 者 | 李聖; 蔡景安; 李玉億; 許元彬; 陳景林; 李國楨; 吳憲政; 謝式儒; | 書刊名 | 台電工程月刊 |
卷 期 | 612 1999.08[民88.08] |
頁 次 | 頁12-24 |
分類號 | 448.14 |
關鍵詞 | 氣渦輪機; 等效運轉小時; 金相分析; 安全係數; Gas turbine; Equivalent operating hour; Metallurgical analysis; Safety factor; |
語 文 | 英文(English) |
中文摘要 | 臺灣電力公司和美國NREC共同完成了一項氣渦輪機技術研究。 該研究重點是分析西門子V84.2 型氣渦輪機第一級葉片的使用壽命。 按西門子廠方要求,每運轉至25,000∼33,000 EOH (Equivalent Operating Hour,等效運轉小時) 臺電需更換該型氣渦輪機第一級所有 葉片。每組葉片不僅價格昂貴,而且由於更換葉片需停機、拆機、更 換後重組裝,導致總體費用非常高。因此很有必要進一步地了解該葉 片的特性,以便決定是否可以延長葉片更換期。 具體的研究步驟是:在臺電一機組處於維修期間,測量氣渦輪機內 部結構及主要零件尺寸,對兩個使用過的第一級葉片做金相分析及葉 片外形的精密測量。同時利用所收集的氣渦輪機運轉數據,對其燃燒 器、氣渦輪各級以及整個結構的工作性能及參數進行分析。在此基礎 上,首先計算出第一級葉片外部的高溫熱流場及葉片內部冷卻氣流熱 流場,然後利用有限元模型計算出葉片本身的溫度及葉片應力分佈。 根據葉片的溫度及應力分佈從而估算出葉片的壽命。 研究分析結果顯示:葉片的壽命約在16,500至36,700 EOH之間 (取決於安全係數的選取),與西門子所建議的葉片更換週期相近。 要更精確估計葉片的壽命,則須從使用過24,000 EOH 後替換下來的葉 片中取試樣做進一步的應力斷裂試驗。然而在收集足夠的試驗數據證 實可以延長葉片更換期之前,臺電仍宜依照西門子的要求按期更換葉 片。 |
英文摘要 | The Taiwan Power Company (TAIPOWER) and NREC have jointly conducted a gas turbine engine research program. The focus of this research program was on the life of the first stage turbine rotor blading within a Siemens V84.2 gas turbine. TAIPOWER has been requested to change out this rotor blading on a regular basis, typically about 25,000 to 33,000 EOH's (Equivalent Operating Hours). A set of replacement blading for these engines is very expensive and the costs to shutdown the engines, disassemble them, and replace the blading are very high. A better understanding of the characteristics of these blades was desired in order to determine if the period of time between blade replacements can be increased. TAIPOWER disassembled one of their units as part of a normally scheduled overhaul. Internal measurements were made to define the geometry of key internal components. Two blades were taken from the set of first stage rotor blades being replaced, and these were measured and subjected to metallurgical analyses. Data on the gas turbine operation were also collected ans used to analyze the performances of the combustor, turbine stages, and overall gas turbine cycle. With these analyses as a basis, the heat transfer rates on the external and internal surfaces of the blades were estimated and then used to generate a finite element model of the blades. These models produced temperature and stress distributions which were then used to predict the life of the first stage turbine rotor blades. The analytical results tend to support the current blade replacement practice as recommended by Siements. The analyses predicts life for these blades of about between 16,500 to 36,700 EOH's depending upon the amount of the safety factor used in the analyses. Some of the blades removed after 24,000 EOH's of use need to be cut into test specimens and subjected to stress rupture testing for more accurate estimating the life remains. TAIPOWER, however, needs to continue to replace the blades in accordance with Siemens' recommendations until sufficient test data is available to justify an increase in the blade replacement period. |