| 題 名 | 電力調度自動化設備運轉上之異狀分析與對策=The Analysis and Counter-Measures of Abnoraml Conditions on the Operation of Power Automation Equipments |
|---|---|
| 作 者 | 黃明鄉; | 書刊名 | 台電工程月刊 |
| 卷 期 | 593 1998.01[民87.01] |
| 頁 次 | 頁74-82 |
| 分類號 | 448.115 |
| 關鍵詞 | 階層調度控制中心; 中央調度控制中心; 區域調度控制中心; 配電調度控制中心; 資訊末端設備; 數位類比轉換器; 無效電力裝置控制; Hierarchical dispatch and control system; HDCS; Central dispatch and control system; CDCS; Area dispatch and control system; ADCS; Distribution dispatch and control system; DDCS; Remote terminal unit; RTU; Analoge to digital converter; ADC; Reactive power device control; RPDC; |
| 語 文 | 中文(Chinese) |
| 中文摘要 | 電力調度自動化為時代趨勢,本公司自1987年3月引進此先進的技術,列為首期 自動化工程之TADCS於1990年7月完成後加入商業運轉,此先進的自動化設備完全以電 腦取代傳統的人工,過去變電所派人值班所做的一切工作,例如停復電操作,記錄負載資料 及監視變電設備之運轉狀況等,已完全改由自動化設備之遠方遙控,定時積算記錄,掃描偵 測等功能所取代,但少了現場值班人員的即時處理突發狀況後,軌必需靠自動化設備之正常 運轉才能將現場戕況正確的傳回TADCS。 因此在自動化設備運轉上若發生異狀而不及時處理,將形成電力設備運轉上之弱點,屆 時知不派人赴現場查視處理,恐將危及供電安全。 TADCS已運轉七年,受就1996年1月以來自動化設備所發生之370件異狀提出分析, 將它們歸納為13類,並提出改善對策,以利製造廠家、規劃、施工、運轉及維護等各單位 了解自動化設備運轉上之弱點所在,避免後續之第二期工程再發生類似之問題,這是本文之 主要目的。 |
| 英文摘要 | In order to meet the power demand for domestic industrial and commercial activity, the power substation have rapidly expanded. However, due to the labor shortage, to have someone in substation on shift duty is insufficient and unefficient. Therefore, the advanced power automatic dispatch and control system is introduced into TPC. TADCS was completed in July, 1990 under the first phase of power automation project. The traditional manual operation is replaced fully by the advanced computer system now. The abnormal condition of the automation equipments will become weakpoints of power system if the appropriate correct actions are not taken on them, or, the additional manpower must be dispatched to the substation to check what abnormal conditions are happened, or may be they will dangerize the safe operation of the power system. Up to now 370 cases of abnormal conditions have happened since Jan. 1996. After systemly analyzing on these cases, 13 categories are classified, and counter-measures on them are offered. We hope these opinions will help the contractor, planning, installation, maintenance and operation units to pay their attentions on them to avoid the same case taking place again on the following second phase of the HDCS project. |