查詢結果分析
相關文獻
- Designing Bayesian Sampling Plans with Type-I Progressive Hybrid Censored Samples
- Designing Bayesian Sampling Plans for Exponential Distributions with Type-II Progressive Hybrid Censoring
- On Designing Sampling Plans with Type-II Progressive Hybrid Censored Samples
- Minimum AFI for CSP-1 Plan Based on Fuzzy Optimization
- Bayesian Average Outgoing Quality Limit Sampling Plans Based on Fuzzy Optimization
- 抽樣計劃之實施﹣﹣單次抽驗之原理及轉換
- Minimum Average Fraction Inspected for CSP-C-1 Plan
- Integrating an EMQ Model and Product Quality
- 考慮製程能力指標之允收抽樣計劃
- Optimal Inspection Allocation in a Multistage Production Process:A Dynamic Programming Approach
頁籤選單縮合
題 名 | Designing Bayesian Sampling Plans with Type-I Progressive Hybrid Censored Samples=在型I逐步混合設限樣本中設計貝氏抽樣計劃 |
---|---|
作 者 | 梁大成; | 書刊名 | 中國統計學報 |
卷 期 | 52:4 2014.12[民103.12] |
頁 次 | 頁449-465 |
分類號 | 319.5 |
關鍵詞 | 型I逐步混合設限; 抽樣計劃; 貝氏抽樣計劃; Acceptance sampling; Progressive hybrid censoring; Sampling plan; |
語 文 | 英文(English) |
中文摘要 | 本文研討如何在型I 逐步混合設限樣本中設計貝氏抽樣計劃。我們考慮兩 種損失函數L1和L2, 並對每一種損失函數, 提出導引貝氏抽樣計劃的方法。本 文比較上述導得的貝氏抽樣計劃與Lin et al.(2013, 損失函數L1) 和Lin and Huang(2012, 損失函數L2) 所建議的抽樣計劃。數值分析結果顯示: 本文建議 的貝氏抽樣計劃表現非常優於Lin et al.(2013) 和Lin and Huang(2012) 所 建議的抽樣計劃。 |
英文摘要 | This article studies the problem of designing Bayesian sampling plans for exponen- tial distributions with type-I progressive hybrid censored samples. Two loss functions, say L1 and L2, are considered. Due to the difference between the two loss functions, for each loss function, a method is developed for deriving the Bayesian sampling plan. We compare the performance of the proposed sampling plans with the sampling plans of Lin et al.(2013) under L1 loss, and with the sampling plans of Lin and Huang (2012) under the L2 loss. The numerical results indicate that the proposed sampling plans outperform much than the sampling plans of Lin et al.(2013) and Lin and Huang(2012), respectively. |
本系統中英文摘要資訊取自各篇刊載內容。