查詢結果分析
相關文獻
- 電漿熔渣中銅金屬之資源回收
- N[feaf]O電漿表面處理對HSQ介電層的材料特性改善與阻隔銅的擴散行為機制之研究與建立
- 鋁青銅以PTA及EBW銲覆於鋁基材之特性評估
- 無污染銅製品光輝浸漬鈍化工程
- 陰離子對以鐵金屬置換廢水中銅離子反應之影響
- 利用選擇性電化學接觸置換法製作銅晶種層及導線
- 電漿處理的鉭擴散阻障層在銅製程的應用
- Plasma Deposited Amorphous Tungsten Nitride Diffusion Barrier for Metal-Organic Chemical Vapor Deposited Cu Metallization
- 環氧雙氰胺覆銅箔玻璃布層壓板用浸漬樹脂漆的研究
- Kinetic Study of Copper Cementation From Wastewaters by Aluminum Powder
頁籤選單縮合
題名 | 電漿熔渣中銅金屬之資源回收=Recycling of Copper from Molten Plasma Slag |
---|---|
作者 | 李清華; 李文成; 陳靖良; 劉冠廷; 張人權; 伍紹文; 顏辰有; Lee, Ching-hwa; Lee, Wen-cheng; Chen, Ching-liang; Liu, Kuan-ting; Chang, Ren-chiuan; Wu, Shao-wen; Yen, Chen-yu; |
期刊 | 科學與工程技術期刊 |
出版日期 | 20100900 |
卷期 | 6:3 2010.09[民99.09] |
頁次 | 頁1-8 |
分類號 | 445.844 |
語文 | chi |
關鍵詞 | 電漿; 熔渣; 浸漬; 晶析; 置換; 銅; Plasma; Slag; Leaching; Crystallization; Replacement; Copper; |
中文摘要 | 本研究主要針對含銅電子廢棄物經電漿熔融處理後熔渣中之銅金屬進行回收純化。本研究 所收集之電漿熔渣經磁選、篩分後之篩下物(-0.149 mm)約尚含有32% 之銅,值得進一步回 收其銅金屬。本研究結果顯示,此電漿熔渣(-0.149 mm)經一次硫酸浸漬,於18N 硫酸、固 液比10 g/50ml、70°C 下,浸漬1 小時,可達成90.56% 之銅浸漬回收率,此一次含銅浸漬液 直接在室溫下靜置48 小時,可將浸漬液中58.28% 之銅晶析成硫酸銅晶體,而晶析過後濾液中 之殘留銅金屬,經以鐵粉為置換劑,可將晶析濾液中之銅100% 予於置換回收。另殘留於一次 硫酸浸漬殘渣中之銅,則可以18N 硫酸在固液比5 g/50ml、70°C 下,浸漬2 小時,可將殘渣中 之銅100% 予以浸漬溶蝕,再以鐵粉置換法,可將二次硫酸浸漬液中之銅100% 予以置換回收。 根據上述方法之實施,應可回收純化電漿熔渣中之有價銅金屬,以達成電漿熔渣之減量及銅資 源永續循環使用之雙重目的。 |
英文摘要 | The main purpose of this study was to recover copper from molten plasma slag. After magnetic separation and screening of the collected material, the slag of less than 0.149 mm in size contained 32% copper worthy of further recycling. The results revealed that 90.56% of the copper can be leached from the dross (-0.149 mm) by using 18N H2SO4 at a solid/liquid ratio of 10g/50mL at 70°C for one hour; moreover, 58.28% of the copper content in this leachate can be crystallized as CuSO4⋅5H2O after standing for 48 hours at 27°C without any disturbance. After crystallization, the remaining copper can be completely recovered by using iron powder replacement. Subsequently, a second leaching treatment was performed on the residue by using 18N H2SO4 at a solid/liquid ratio of 10g/50mL at 70°C for 2 hours. It was also observed that 100% of the copper content in the second leachate can be recovered by iron powder replacement. |
本系統之摘要資訊系依該期刊論文摘要之資訊為主。