查詢結果分析
來源資料
相關文獻
- Cycle Time Reduction of a Color Monitor Tube Fluorescent Coating Ling
- 正方晶系、長方晶系和體心晶系的格位格林函數的數學分析
- 警政資訊系統分散式處理架構之研究
- 動態與靜態垂挺度自動測試系統的設計與其應用
- 改良型警政資訊系統:分散資料處理技術之應用
- The Exact Solution of A Bayonet Tube Heat Exchanger At High Temperature
- DNA序列與數學分析簡介
- A Mathematical Analysis of the Oxygen Uptake after Strenuous Exercise
- 純交互作用控制下雙颱風相對運動的數學分析及與實際個案路徑的比較
- 河川水質變動之數學分析
頁籤選單縮合
題 名 | Cycle Time Reduction of a Color Monitor Tube Fluorescent Coating Ling=彩色映管塗佈線降低週期時間分析 |
---|---|
作 者 | 宮大川; | 書刊名 | 中原學報 |
卷 期 | 27:1 1999.03[民88.03] |
頁 次 | 頁51-59 |
分類號 | 440.8 |
關鍵詞 | 彩色映管; 塗佈製程; 模組分離概念; 數學分析; 降低週期時間; Color monitor tube; Fluorescent coating process; Modular separation concept; Mathematical analysis; Cycle time reduction; |
語 文 | 英文(English) |
中文摘要 | 彩色映管(CMT)屬高投資成本的生產事業,無 論就品質或產出率而言,塗佈製程可視為CMT生 產中重要的一環,因在其製程中,任何無謂的動作 或延宕均能造成CMT生產力的降低。本文將以 一實例說明如何增進CMT之產量,所考量的塗佈 線包含二十種不同的設備;縱使每個設備可從容完 成所指派的作業,但整線未必能達預期之生產力。 我們受邀設法降低15%的週期時間,經採用模組分 離概念和數學分析技術,我們建議調整輸送臂速 度、機械臂運動路線、支撐柱位置和部份作業時 間;經三個月的改善期,目標達成。值得一提的是, 本文所探討的唯僅為工程的工作,然存在一主要頁 獻--展現了一種簡單的問題求解過程。 |
英文摘要 | The color monitor tube (CMT) production has been claimed as a high-cost investment. The fluorescent coating process is critical to the CMT production in both the quality and the yield rate. Any unnecessary motion or improper delay in the process may reduce the entire CMT productivity. In this paper, a real case study of how to improve the fluorescent coating throughput is discussed. The concerned fluorescent coating process system is organized in a line of 20 different types of devices. Although an individual device could leisurely accomplish its assigned operation on time, the entire line does not reach the expected productivity. We are asked to reduce the cycle time up to 15%. A modular separation concept and several mathematical analysis techniques are applied. We conclude a set of adjustments in transfer arm speed, robot trajectory, supporting beam location, and some operation time. These ajustments lead to the modification of some mechanical and control engineering work. After three months of implementation, we are told that the goal has been reached. This paper emphasizes an engineering work. The major contribution is to demonstrate a natty thought in the problemsolving procedure. |
本系統中英文摘要資訊取自各篇刊載內容。