題名 | 九州八丁原2H-17號地熱井盲鑽解決漏泥問題之研討=On Solving Lost Return Problem by Blind Drilling at Geothermal Well 2H-17, Hatchobaru, Kyushu, Japan |
---|---|
作者姓名(中文) | 林錦仁; | 書刊名 | 鑛冶 |
卷期 | 41:4=160 1997.12[民86.12] |
頁次 | 頁65-70 |
分類號 | 457.4 |
關鍵詞 | 盲鑽; 井程控制; 目標層; 套管水泥; Blind drilling; Well course control; Target formation; Casing cemented; |
語文 | 中文(Chinese) |
中文摘要 | 地熱井之套管可分為四層,每層套管均有其作用與目的,除生產層之槽孔管外,其他各層套管外圍均需以水泥封固,使套管受熱膨脹而引起之熱應力能平均分佈,並能隔離不必要之流體流入井內,期能生產優良品質之蒸汽。八丁原2H-17號地熱井在鑽鑿171/2"井孔中突然發生漏泥不循環,經80多天及各種方法堵漏均無效後提早下13 3/8"中間套管水泥,以盲鑽方法克服漏泥問題,最後仍以原計畫之7"槽孔管完井,此種施工方法在八丁原地熱田尚屬創舉。 |
英文摘要 | These are usually four layers of casing pipe in a geothermal well, each layer has its purpose. In addition to the slotted pipe for production zone, other layers of casing should all be bonded by cement slurries behind the pipe, so that stress induced in the pipe by thermal expansion would equally be distributed. This would also prevent useless fluids entering into the well that high quality steam production could be expected. The well Hatchobaru 2H-17 lost circulation suddenly with no return during drilling 17 1/2" hole, the circulation could not be restored after 80 more days of trouble shooting. Intermediate casing of 13 3/8" and cementing jobs were forced to run, and blind drilling was undertaken to overcome the lost return problems. The well was finally completed with 7" slotted pipe according to the original plan. This kind of drilling and completion method were first run in Hatchobaru geothermal field. |
本系統之摘要資訊系依該期刊論文摘要之資訊為主。