題 名 | 鑽炸法隧道施工進度之探討=Study on Rate of Progress for Tunnels with D&B Method |
---|---|
作 者 | 張吉佐; 侯秉承; 李民政; | 書刊名 | 地工技術 |
卷 期 | 59 1997.02[民86.02] |
頁 次 | 頁17-26 |
分類號 | 441.9 |
關鍵詞 | 隧道; 施工進度; 輪進作業時間; Tunnel; Progressive rate; Cycle time; |
語 文 | 中文(Chinese) |
中文摘要 | 隧導工程近年來已逐漸成為重大公共工程之施工要徑,其施工進度與重大工程之 完工息息相關,而國內之隧道施工進度比諸國外甚至國內之外國包商有相當之差距,仍有相 當大的提昇空間。本文係針對鑽炸工法施工之山岳隧道,摘述國內隧道施工現況及既有之研 究成果,藉由國內外隧道施工技術及進度等之比較,探究影響國內隧道施工進度落後之原因 ,最後從營建法規、合約文件、施工管理及施工技術等各層面探討改善隧道工程作業與流程 之可能對策。 |
英文摘要 | Tunnelling has gradually become the critical path of large-scale public infrastructure projects in Taiwan. The progressive rate of tunnelling usually controls the completion schedule of the whole project. A significant difference of progressive rate of tunnelling exists between domestic and abroad, and even that of the foreign contractors in Taiwan. Study on improving the progressive rate of tunnelling by local contractors is worthwhile. The study is mainly concerned with drill and blast construction method for long mountain tunnels. The method of study in cludes collecting of data, both domestic and abroad, and integration of existing study results, establishing of a basic background data bank of the study. Comparisons will be made between local tunnel construction techniques and progresses by both local and foreign contractors, and those of foreign countries, and a review will be made on the factors affecting the progress of domestic tunnel construction projects. Finally, from the point of view of existing construction regulations, contract documents, construction management and construction technique, a proposal on measures to be taken to improve tunnel construction operation and procedure will be outlined. |
本系統中英文摘要資訊取自各篇刊載內容。