題 名 | 臺電水力發電工程=Taipower's Hydro Power Projets |
---|---|
作 者 | 張明士; | 書刊名 | 台電工程月刊 |
卷 期 | 573 1996.05[民85.05] |
頁 次 | 頁6-41 |
分類號 | 448.15 |
關鍵詞 | 岩體品質指數; 新奧工法; 隧道鑽掘機; 尖峰地表加速度; 最大可能洪水; Norwegian geotechnical institute tunnelling quality index; NGI-Q; New austrian tunnelling method; NATM; Tunnel boring machine; TBM; Peak ground acceleration; PGA; Probable maximum flood; PMF; |
語 文 | 中文(Chinese) |
中文摘要 | 本公司近年來辦理明湖、明潭抽蓄、翡翠水庫、東部木瓜溪水力以及進 行中之新天輪、馬鞍、士林等工程,在土木設計及施工上開發和引進許多技術和 工法,欣逢不公司50週年慶,特借臺電工程月刊做一報導。 |
英文摘要 | During the past decades, many design technics andconstruction methods of the civil engineering of hydropowerplants have been developed by or introduced to Taiwan PowerCompany. They have been applied to some newly completedprojects such as Minghu and Mingtan pumped storage projects,Feitsui Dam and Mukua Creek project and some projects underconstruction such as New Tienlun project, Maan project andShihiin project. This paper briefly reports some new technicsapplied in the hydro projects |