題 名 | 配電變電所及饋線設置標準之研究=Criteria for Setting Up District Substation and Feeder |
---|---|
作 者 | 林惠民; 鍾維杰; 余俊仲; | 書刊名 | 台電工程月刊 |
卷 期 | 569 1996.01[民85.01] |
頁 次 | 頁16-29 |
分類號 | 448.132 |
關鍵詞 | 路權; 可進入性; 負載中心; 現值法; 動態規劃; 最短路徑理論; 潛在饋線網路; 人機介面; Right of way; Accessibility; Center of load mass; Present worth method; Dynamic programming; Shortest path theorem; Potential routing network; Man machine inerface; |
語 文 | 中文(Chinese) |
中文摘要 | 本研究進行「區域計劃變電所設置標準」的研究,並求在經濟效益與系 統損失及可靠度間求取平衡。變電所設置標準應當考慮既有設備的擴充與新址的 選擇,需要面對的因素甚多,包括地理、環境、民意甚至政治的限制。好的標準 能適當地分配負載,達到電力設備的最佳利用率。變電所電壓的選擇與饋線的設 置則包括主變、饋線、饋線容量、路徑等,皆為本研究所考量的項目。並且將各 種電力上的限制一併考慮在內,以期結果能滿足各安全需求。 本研究以臺電公司目前及歷史的資料加以分析、整理,建立電腦資料庫考慮實際 地理上限制,利用電腦分析功能及強大的資料處理特性,解決中、長期配電系統 規劃變電所位置及其裝置容量的最佳選擇問題;除此之外,亦根據最短路徑理論 (Shortest Path Theorem),提出沿著實際街道的饋線設置模式,解決真實的變電所 服務區域內饋線,網路結構,並利用臺電公司高雄市一個區域當作研究對象,根 據負載預測值作短、中、長期規劃。 |
英文摘要 | This research tried to set up criteria for distributionsubstation and feeder. Economic factors, system loss andreliability were all considered. Substation standard needed toconsider are the existing capacities, substation expansion andnew locations. Physical constraints needed to be considered aregeographical, environmental, and even political limitations. Onthe other hand, substation service areas can also be determinedby these standards to maximize the system utilization.Substation voltage selection and feeder routing problems werealso assessed in this research to ensure the economy andsecurity. Graphical and text data were collected to build thedistribution data base. Short, middle and long-term distribution system planning problems were studied includingsubstation siting and sizing. With the shortest path theorem,feeder routing problem is considered using physical streetroutes. A physical distribution system in Kaohsiung was usedin this study for simulatioin. |