題名 | 工程進度規劃自動評核系統=Schedulecoach: An Automated Schedule Advisory System |
---|---|
作者 | 李欣運; 曾仁杰; Lee, Hsin-yun; Dzeng, Ren-jye; |
期刊 | 中國土木水利工程學刊 |
出版日期 | 20030900 |
卷期 | 15:3 2003.09[民92.09] |
頁次 | 頁623-630 |
分類號 | 441.3 |
語文 | chi |
關鍵詞 | 進度排程; 案例式推理; 法則式推理; 人工智慧; Schedule; Case-based reasoning; Rule-based reasoning; Artificial intelligence; |
中文摘要 | 良好的進度規劃有助於工程專案的順利進行,然而受限於規劃者的經驗,龐雜的進度網圖中經常有許多筆誤、疏忽、矛盾或不合法規的錯誤,卻難以人力逐一檢查核對。本研究為進度規劃知識建立了評核法則一般化表達模式,使得進度規劃知識得以法則形式表達與記錄儲存,並以此為基礎,建立ScheduleCoach系統,供進度工程師管理進度規劃的法則知識與工程案例資料,並以法則式推理模式自動評核進度網圖,協助檢查潛在的錯誤,進而應用案例式推理來提供修正建議。 |
英文摘要 | Planning and scheduling is a key factor to the success of a construction project. Because of the increasing complexity and size of construction projects nowadays, pre-construction schedules tend to comprise a large number of activities. These schedules often contain unintentional errors and conflicts, and those due to the lack of experience. These mistakes need to be corrected by experienced schedulers. However, due to the number of activities involved, sometimes the mistakes are hard to find. This research establishes a generalized schedule knowledge representation model for an integration of rule-based and case-based reasoning. The model allows a detailed representation of scheduling knowledge captured from previous successful projects. A computer system, named ScheduleCoach, was also developed based on this generalized model to help schedule reviewers review pre-construction schedules. ScheduleCoach can identify potential errors in a schedule, explain why its critiques are, and possibly suggest appropriate corrections based on rule-based and case-based reasoning. |
本系統之摘要資訊系依該期刊論文摘要之資訊為主。