題名 | Lifecycle Assessment of Maintenance, Repair and Rehabilitation Costs: A Deterioration Modeling Approach for Bridge Components=以橋梁構件劣化預測模型建構生命週期維護成本評估模式 |
---|---|
作者 | 毛一祥; 黃榮堯; | 書刊名 | 中國土木水利工程學刊 |
卷期 | 27:1 2015.03[民104.03] |
頁次 | 頁47-57 |
分類號 | 441.88 |
關鍵詞 | 橋梁; 劣化; 維護成本; Bridge; Deterioration; MR&R cost; |
語文 | 英文(English) |
中文摘要 | 橋梁生命週期成本可涵蓋許多成本類別。本研究係針對生命週期中之維護成本分析,期待透過大量數據的蒐集、建立合理客觀的劣化預測模式及採用適當的資料處理方法,而得到較精確的估計。本研究將以一系統性的分析流程,先找出影響各橋梁構件之劣化因子,並以該因子所組成之屬性條件,去篩選出資料庫中與目標橋梁具有相近劣化行為之代表橋群。再由橋梁檢測記錄去定義一新的橋梁構件狀況指標,同時導入類似可靠度指標的概念,將橋梁構件劣化程度予以量化。因此,利用所得代表橋群構件之狀況指標,即可歸納出目標橋梁之劣化模式。最後,再以該模式推估橋梁營運時期之維修成本。本研究最後以橋面伸縮縫為例,利用本研究所提出之成本模型估算其生命週期之維修成本,並以所蒐集之樣本資料比較驗證。本研究所建議之模型亦可推廣至其他橋梁構件,進而推估整橋之維護成本。 |
英文摘要 | Bridge lifecycle cost (LCC) covers numerous cost categories. This paper focuses on maintenance, rehabilitation, and repair (MR&R) costs, demonstrating how they can be objectively estimated using visual inspection data. The proposed approach involves retrieving bridge samples similar to a target bridge from inventory. The target bridge is assumed to deteriorate similarly to the retrieved samples. A stochastic method is used to determine when and what MR&R actions are taken. The costs of various MR&R actions are surveyed from relevant previous contracts; thus, the MR&R cost per bridge component is the sum of costs for all actions activated throughout its lifespan. Monte Carlo simulation (MCS) was applied to generate a probability distribution as a stochastic result. Finally, a bridge component, expansion joint, was examined to demonstrate the model framework. Likewise, the proposed approach can be applied to other bridge components to evaluate the total MR&R cost for an entire bridge. |