頁籤選單縮合
題名 | 高層建築深基礎開挖施工逆築與順築工法之設計與實測 |
---|---|
編 次 | 上 |
作者 | 陳坤泉; 張吉佐; | 書刊名 | 現代營建 |
卷期 | 19:3=219 1998.03[民87.03] |
頁次 | 頁21-27 |
分類號 | 441.54 |
關鍵詞 | 高層建築; 深基礎開挖施工; 逆築工法; 順築工法; |
語文 | 中文(Chinese) |
英文摘要 | Both the Top-Down and the Bottom-Up construction methods are commonly used for routine deep excavation. This paper presents the analytical model, design sequence of retaining wall and bracing system of deep excavation for both construction methods. Two case histories of deep excavation monitoring results are also provided to demonstrate the behavior of retaining wall and bracing system of both construction methods. |
本系統之摘要資訊系依該期刊論文摘要之資訊為主。