| 題 名 | 臺北捷運潛盾施工資料庫之建置=Establishment of Shield Tunnel Construction Database in Taipei Metro |
|---|---|
| 作 者 | 張正憲; 曾紀緯; 賴建名; 朱慶村; 黃怡超; 廖純璋; | 書刊名 | 捷運技術 |
| 卷 期 | 59 2024.10[民113.10] |
| 頁 次 | 頁171-195 |
| 分類號 | 312.74 |
| 關鍵詞 | 臺北捷運; 潛盾隧道施工; 資料庫; 制式化表單; Taipei Metro; Shield tunnel construction; Database; Standard format; |
| 語 文 | 中文(Chinese) |
| DOI | 10.29670/JRTST.202410_(59).0008 |
| 中文摘要 | 「臺北捷運」的建設迄今已逾 35 年,為都會區中對於解決通勤與洽公最 重要及便捷的大眾運輸工具,並於 2023 年獲票選全球前十大最佳大眾運輸系 統。然而「臺北捷運」大部分的所建置的路線位於臺北市交通繁忙的精華路 段,因此大致上在非車站路段皆以潛盾隧道作為主要之路線設計,臺北捷運 局也擁有豐富的施工經驗與紀錄資料。 惟過去資訊的建置與傳遞方式、速度與儲存方法受到環境及設備的限制 並未能完全數位化,導致未能利用電子化設備有效紀錄及保存潛盾施工過程 之操作參數,藉由潛盾施工資料庫之建置,有效率地收集過往的施工資料並 建立統一的潛盾施工資料格式,除有利於未來持續擴充潛盾施工資料外,亦 可針對該數據資料做進一步的應用,降低未來潛盾施工之事故發生的風險及 增進未來施工效率與品質。 本文將進一步說明潛盾施工之資料收集、制式化表單的建立與資料庫平 臺的建置。 |
| 英文摘要 | "Taipei Metro" has been developed for over 35 years and is the most important and convenient public transportation system in Taiwan. In 2023, it was voted as one of the top ten best public transportation systems globally. However, most of the Taipei Metro system is constructed in the prime areas of Taipei City, and therefore, the main route design predominantly utilizes the shield tunnel method. The construction of the Taipei Metro has accumulated rich experience and records. However, in the past, information dissemination, speed, and preservation methods were not well-developed, resulting in the ineffective recording and preservation of operational parameters during shield tunneling construction. By establishing a shield tunneling construction database, past construction data can be efficiently collected and a standardized format for shield tunneling construction data can be established. This not only facilitates the continuous expansion of shield tunneling construction data but also allows for further application of the data, reducing the occurrence of accidents in future shield tunneling construction and improving construction efficiency and quality. This paper will further explain the collection of shield tunneling construction data, the establishment of standardized forms, and the development of a database platform. |