題名 | Study of PDRI for the Project Management of Intelligent Green Building=智慧綠建築專案管理PDRI之研究 |
---|---|
作者 | 張岸礕; 朱惕之; 黃兆龍; 林志棟; Chang, An-pi; Chu, Tih-ju; Hwang, Chao-lung; Lin, Jyh-dong; |
期刊 | 品質學報 |
出版日期 | 20150800 |
卷期 | 22:4 2015.08[民104.08] |
頁次 | 頁299-320 |
分類號 | 441.3 |
語文 | eng |
關鍵詞 | 智慧建築; 綠建築; 營建專案管理; 專案先期規劃; Intelligent building; Green building; Construction project management; Pre-project planning; IGBP-PDRI; |
中文摘要 | 本研究以美國CII於1995年所研發Project Definition Rating Index(PDRI)評估模式為方法論,結合智慧建築、綠建築設計評估基準,以及營建專案管理作業,研發一套評估方法稱之為智慧綠建築專案管理評估系統(Intelligent Green Building Project Management EvaluationSystem)。評估系統可整合專案開發作業需求,進行專案策略、目標、流程等管理作業的整合。主要應用於專案先期規劃(Pre-Project Planning)評估,可利用規劃所得檢核表持續對專案執行過程進行監視與控制,確保專案達成進度、成本、品質、變更設計預算等目標績效。本研究所建立之IGBP-PDRI評估模式,包括4個部分、11個分類及60個元素,最後經本研究驗證,當總體評估總分≤200分的情況時,智慧綠建築專案執行成本低於預算2%,進度超前3%,設計變更預算控制在總預算的2%以內,且在建築物電力節能成效高於預期節省22.01%,營建廢棄物回收百分比高達78.22%,計畫書審查績效超越績效目標值6.59%,施工圖審查績效超越績效目標值4.87%,安全與衛生稽查合格率高達96.34%,施工查驗合格率高達90.45%,營建材料檢試驗合格率達99.43%,研究驗證成果顯示,IGBP-PDRI評估模式對於先期專案計畫(pre-project planning)的評估,可滿足整體營建工程的品質。 |
英文摘要 | By combining the Project Definition Rating Index (PDRI) with intelligent buildings, green buildings, and construction project management, this study developed the Intelligent Green Building Project (IGBP) to define the scope of pre-project planning. The IGBP can effectively integrate the development strategy, processes, and objectives based on project development needs. The PDRI was developed and applied to industry and construction businesses respectively in 1996 and 1999. It was mainly used to assess pre-project planning and evaluate the performance of project execution, quality, cost, and design change, as well as predict project success. The IGBP-PDRI model in this study included four sections, 11 categories, and 60 elements. The model verification results show that when the total score is ≤ 200, IGBP implementation cost is 2% below budget, schedule is 3% ahead, design change budget is below 2%, building energy saving performance is 22.01% higher than expected, construction waste recycling rate is up by 78.22%, plan review performance is 6.59% higher than the target, construction drawing review performance is 4.87% higher than the target, safety and health audit pass rate is 96.34%, construction review pass rate is 90.45%, and building material inspection pass rate is 99.43%. These results show that IGBP-PDRI can fulfill the overall project quality demand in pre-project planning assessment. |