| 題 名 | 貓空纜車系統大修作業實務=The Overhaul of Maokong Gondola System |
|---|---|
| 作 者 | 任禮源; | 書刊名 | 軌道經營與管理 |
| 卷 期 | 14 2014.12[民103.12] |
| 頁 次 | 頁42-57 |
| 分類號 | 447.18 |
| 關鍵詞 | 貓空纜車; 大修; 索輪組; 雙握索器; Maokong Gondola; Overhaul; Sheave train; Double grip; |
| 語 文 | 中文(Chinese) |
| 中文摘要 | 貓空纜車系統維修工作利用平常夜間非營運時段及週一檢修日進行,而貓空纜車共有 6個車站(包含 2個轉角站)、47支塔柱及 147部車廂,設備數量龐大,夜間及週一檢修日之維修能量無法負荷大修作業,故須額外擇定一段期間暫停營運以進行大修作業。為避免暫停營運過久影響營收及外界觀感,各項大修作業須在最短天數內完成,為確保維修品質,遇有重要維修工作或設備首次拆裝時,會請原廠技師現場指導,此外,本公司亦透過自行開發設計輔助設備(如雙握索器)及改善工法以達到提升維修效率並節省維修成本之目的。 |
| 英文摘要 | The maintenance of the Maokong Gondola system takes place overnight, outside operating hours, and on Mondays. The system has 6 stops, including two angle stations, 47 towers and 147 cabins; in other words, a considerable amount of equipment to be maintained, which is often impossible to cover during nighttime and Monday maintenance sessions. Therefore, it is sometimes necessary to arrange extra down time for overhaul. However, to avoid long periods of suspension affecting revenue and public perception, such overhauls need to be completed in as little time as possible. To ensure maintenance quality, we always commission technicians from the original manufacturer to be present whenever significant works or first-time installations or dismounts are being performed. Additionally, auxiliary equipment developed in-house(such as the “double grip”) help improve working methods, and save cost while increasing maintenance efficiency. |
本系統中英文摘要資訊取自各篇刊載內容。