查詢結果分析
來源資料
相關文獻
- Parallel-Machine Scheduling with Deteriorating Jobs and Rate-Modifying Activities to Minimize Total Completion Time
- 人機互動式排程系統之研究
- 開發平行機臺製造單元之多目標排程輔助系統
- 晶圓針測廠排程演算法之設計
- 相依整備時間考量下具等效平行機臺之多階段流程型排程問題啟發式求解模式建構
- Unrelated Parallel-Machine Scheduling Simultaneously with Rate-Modifying Activities and Earliness and Tardiness Penalties
- Parallel Machines Scheduling with Deterioration Effects and Resource Allocations
- A Study of Unrelated Parallel-Machine Scheduling with Deteriorating Maintenance Activities to Minimize the Total Completion Time
- Bicriteria Supply Chain Scheduling on Unrelated-Parallel Machines
- Parallel Machines Scheduling with Simultaneous Considerations of Position-Dependent Deterioration Effects and Maintenance Activities
頁籤選單縮合
題 名 | Parallel-Machine Scheduling with Deteriorating Jobs and Rate-Modifying Activities to Minimize Total Completion Time=退化性工作與可選擇性維修之平行機臺生產排程研究 |
---|---|
作 者 | 趙傳立; 郭家源; 許洲榮; | 書刊名 | 工業工程學刊 |
卷 期 | 28:6 2011.09[民100.09] |
頁 次 | 頁485-491 |
分類號 | 494.5 |
關鍵詞 | 排程; 平行機臺; 退化性工作; 選擇性維修; Scheduling; Parallel-machine; Deteriorating jobs; Rate-modifying activity; |
語 文 | 英文(English) |
英文摘要 | This article explores the parallel-machine scheduling problems in which the processing time of a job is a linear function of its starting time and the job-independent deterioration rates are identical for all jobs. We implemented a rate-modifying activity to change the processing time of the jobs that followed this activity on each machine. Therefore, the actual processing time of a job varied given that it depended not only on its starting time but also on whether it was scheduled before or after the rate-modifying activity. Hence, the objective of this study was to determine the job sequence on each machine and the position of rate-modifying activity on each machine so that the total completion time was minimized. We showed that the problem could be solved in polynomial time when the number of machines was fixed. |
本系統中英文摘要資訊取自各篇刊載內容。