題 名 | 潛盾近接施工實務--以高雄捷運為例=Case Study on Neighboring Shield Tunnelling Constructions--Examples in Kaohsiung Rapid Transit Project |
---|---|
作 者 | 范陳柏; 趙際禮; 劉育志; | 書刊名 | 地工技術 |
卷 期 | 114 2007.12[民96.12] |
頁 次 | 頁83-96 |
分類號 | 441.9 |
關鍵詞 | 近接施工; 潛盾施工; 地盤改良; Construction near existing structures; Shield tunnel construction; Ground treatment; |
語 文 | 中文(Chinese) |
中文摘要 | 由於大眾捷運系統多在都會區內施作,因此潛盾隧道鄰近構造物施工的情形也相當普遍,例如穿越大樓、橋樑、鐵道下方等。此類在潛盾隧道施工路線上遭遇重要構造物之案例,需對其進行影響程度評估並決定應採取之適當掘進參數、保護措施及監測對策。本文以高雄捷運部份近接施工為例,說明相關處理方式,供日後類似施工之參考。 |
英文摘要 | Constructing shield tunnels near existing structures such as passing underneath buildings, bridges or railways has become more and more common in metropolitan rapid transit projects. For these works it is quite essential to assess the construction impact level, adjust drilling parameters by feedback analysis, arrange monitoring systems based on the behaviors of the existing structure and perform protection countermeasures such as ground improvement. The approaches adopted for shield tunnel construction near existing structures in Kaohsiung Metropolitan Rapid Transit project will be introduced in this article as a reference for similar projects in the future. |