頁籤選單縮合
題名 | Properties of Two-Machine No-Wait Flow-Shop Scheduling with a Non-Resumable Unavailable Interval= |
---|---|
作者 | Li, Debiao; Chen, Kejia; Wang, Xiao; |
期刊 | 工業工程學刊 |
出版日期 | 20170100 |
卷期 | 34:3 2017.01[民106.01] |
頁次 | 頁232-238 |
分類號 | 494.542 |
語文 | eng |
關鍵詞 | Two-machine flow-shop scheduling; Unavailable interval; No-wait; Complexity; Worst-case performance ratio; |