查詢結果分析
相關文獻
頁籤選單縮合
題名 | Tsengwen Reservoir Watershed Hydrological Flood Simulation under Global Climate Change Using the 20 km Mesh Meteorological Research Institute Atmospheric General Circulation Model (MRI-AGCM)= |
---|---|
作者 | Kimura, Nobuaki; Chiang, Shen; Wei, Hsiao-ping; Su, Yuan-fong; Chu, Jung-lien; Cheng, Chao-tzuen; Liou, Jun-jih; Chen, Yung-ming; Lin, Lee-yaw; |
期刊 | Terrestrial, Atmospheric and Oceanic Sciences |
出版日期 | 20140600 |
卷期 | 25:3 2014.06[民103.06] |
頁次 | 頁449-461 |
分類號 | 436.124 |
語文 | eng |
關鍵詞 | IFAS; High-resolution MRI-AGCM3.2S; Flood simulation; Tsengwen Reservoir watershed; Global climate change; |
英文摘要 | Severe rainstorms have occurred more frequently in Taiwan over the last decade. To understand the flood characteristics of a local region under climate change, a hydrological model simulation was conducted for the Tsengwen Reservoir watershed. The model employed was the Integrated Flood Analysis System (IFAS), which has a conceptual, distributed rainfall-runoff analysis module and a GIS data-input function. The high-resolution rainfall data for flood simulation was categorized into three terms: 1979-2003 (Present), 2015-2039 (Near-future), and 2075-2099 (Future), provided by the Meteorological Research Institute atmospheric general circulation model (MRI-AGCM). Ten extreme rainfall (top ten) events were selected for each term in descending order of total precipitation volume. Due to the small watershed area the MRI-AGCM3.2S data was downsized into higher resolution data using the Weather Research and Forecasting Model. The simulated discharges revealed that most of the Near-future and Future peaks caused by extreme rainfall increased compared to the Present peak. These ratios were 0.8-1.6 (Near-future/Present) and 0.9-2.2 (Future/Present), respectively. Additionally, we evaluated how these future discharges would affect the reservoir's flood control capacity, specifically the excess water volume required to be stored while maintaining dam releases up to the dam's spillway capacity or the discharge peak design for flood prevention. The results for the top ten events show that the excess water for the Future term exceeded the reservoir's flood control capacity and was approximately 79.6-87.5% of the total reservoir maximum capacity for the discharge peak design scenario. |
本系統之摘要資訊系依該期刊論文摘要之資訊為主。