題名 | 捷運的第一條通車路線=The First MRT Line in Operation |
---|---|
作者 | 李天池; Lee, Tian-chyr; |
期刊 | 捷運技術 |
出版日期 | 20070800 |
卷期 | 37 2007.08[民96.08] |
頁次 | 頁155-162 |
分類號 | 442.96 |
語文 | chi |
關鍵詞 | 捷運; 木柵線; |
中文摘要 | 捷運工程為大台北都會區重要交通建設,民國 85 年3 月28 日第一條捷運系統中運量木 柵線通車,由於係統包工程,有別於其他路線,其設計審查、施工管理皆為東區工程處辦理, 本文主要以東區工程處「招牌」隨辦公地點變遷、處長之更換及木柵線大樑之上梁典禮開始 至完成帽梁補強後之通車,就既有之照片說明,並概略介紹木柵線之延伸線—內湖線及目前 施工情形,並期許得以順利連接第一條通車路線—木柵線。 |
英文摘要 | The Rapid Transit System is a vital transportation link in Taipei metropolitan area. The Muzha line, the first line to come into operation, is a medium capacity transit system which began operation in March, 28, 1996. Unlike the other MRT lines, the Muzha line is a turnkey project, that is, both design review and construction management were executed by DORTS’ East District Project Office (EDPO). Demonstrated with photographs, this article includes the following contents: relocation of EDPO’s office, EDPO’s former directors, top-beam setting ceremony, pier caps reinforcement with the beginning of operations following soon after. A brief introduction and a description of the current construction status of the Neihu line, an extension of the Muzha line, are also included in this article. We hope the Neihu line will be completed on schedule and connect with the Muzha line smoothly. |
本系統之摘要資訊系依該期刊論文摘要之資訊為主。