頁籤選單縮合
題 名 | Investigation of Tunnel Stress Path during Face Advancement |
---|---|
作 者 | Chen, C. N.; Huang, W. Y.; | 書刊名 | Journal of Mechanics |
卷 期 | 23:4 2007.12[民96.12] |
頁 次 | 頁451-458 |
分類號 | 332 |
關鍵詞 | Bench cut tunneling; Round; Stress path method; Principal stress space; |
語 文 | 英文(English) |
英文摘要 | Tunnel stress path during excavation was investigated in the study scope. The triple-center section is commonly designated for highway tunnels, but the analytical solution of the stress state for a non-circular tunnel section with multiple bench excavations is difficult to obtain. Our investigation provides an algorithmic procedure which reliably evaluates stress adjustment of a bench excavation with respect to the three-dimensional state of stress. Evaluation of a safety factor at the tunnel face during advancement is performed following the stress path and principal stress space. Keywords : Bench cut tunneling, Round, Stress path method, Principal stress space. |
本系統中英文摘要資訊取自各篇刊載內容。