題 名 | 臺灣日式建築古蹟修復大木作工程預算編列與執行差異性探討--以高雄橋仔頭糖廠社宅事務所為例=Discrepancies between Carpentry Budget Planning and Execution for Japanese Historical Buildings in Taiwan--An Example in Kaohsiung Ciao-Tou Sugar Plant |
---|---|
作 者 | 蔡明堂; 王裕仁; | 書刊名 | 營建管理季刊 |
卷 期 | 105 2016.08[民105.08] |
頁 次 | 頁36-53 |
分類號 | 790.25 |
關鍵詞 | 古蹟修復; 歷史建築; 大木作; 預算編列; 變更設計; Monument restoration; Historic buildings; Large wooden; Budgeting; Design changes; |
語 文 | 中文(Chinese) |
中文摘要 | 古蹟修復工程屬特殊採購,其經費使用分為「調查研究與修復計畫」、「規劃設計監造」、「工程施作」、「工作報告書」四個主要階段,其中以規劃設計階段之作業程序最為繁多與重要。在古蹟修復工程預算編列時,常因建築物屋齡、材質、類型、匠師、調查方法等因素,以致施工拆卸後與設計內容呈現落差。此外,屋架工程之大木作構架,無法輕易目視判斷損壞程度,倘若變更設計差異太大,將影響後續工項及預算執行。基此,本研究重點於八案大木作修復工程,透過業界訪談及專家諮詢,據以分析相關資料。本研究目的係針對變更設計工程項目與原設計落差、木構造預算編列與實際執行差異等項提供建言,以期避免後續工程進行期間辦理變更設計。 |
英文摘要 | Historical building restoration is unique in nature and has special procurement procedures. The total budgeting process includes four major stages: Investigation and Restoration Plan, Design and Supervision Plan, Project Execution and Final Project Report. Among them, Design and Supervision Plan stage is the most important and complicated one. When preparing the restoration budget during the design stage, factors such as age of building, material, type, craftsmanship, investigation techniques will have significant impacts on estimation accuracy and potential change orders in the later stage. Some large wooden structures cannot be easily seen during the inspection and thus makes it difficult to examine the extent of damage. Differences between design and actual repair is common for large wooden structures and this leads to change designs. This research collected information from eight cases and specifically focuses on large wooden structure repair work. Also, the current planning/design and construction practices will be examined through industry interviews. Information through expert interviews and data collected from the eight cases are then analyzed. The goal is to provide suggestion for better estimation during the design stage when dismantling for inspection is not feasible for large wooden structure. As a result, potential design changes and disputes can be avoided in the construction stage. |