題名 | 壹號燒結場拌料滾筒大修作業=The Mixing Drum Revamping of No.1 Sinter Plant |
---|---|
作者 | 陳志忠; Chen, Chih-chung; |
期刊 | 技術與訓練 |
出版日期 | 19971000 |
卷期 | 22:5=186 1997.10[民86.10] |
頁次 | 頁117-130 |
分類號 | 454.8 |
語文 | chi |
關鍵詞 | 拌料滾筒; 滾胎; 驅動小齒輪; 環齒輪; Mixing drum; Drum; Tire; Drive pinion; Ring gear; |
中文摘要 | 一號燒結場 Mixing Drum 自 1997 年建廠開工至今運轉約 20 年,由於長期運轉 後之設備磨損產生振動因而造成滾胎表面之波浪狀滾紋及驅動小齒輪與環齒輪之異常磨損。 操作中雖利用定修時現場多次檢修但仍無法獲得改善,故本場決定配合一號高爐於 85 年大 修期間針對此設備作一徹底整修。 |
英文摘要 | It has been about twenty years for the operation of the Mixing Drum since the No.1 Sinter Plant was constructed and started in 1997. As a consequence of the facilities abrasion of long-term running and the subsequent vibration, not only did the Mixing Drum's Tire appear obvious wavy surface but the abnormal abrasion happened on the Drive Pinion as well as the Ring Gear. The dilemma still couldn't be improved despite many times' repaired works on site during regular plant shut down. For this reason, we decided to proceed with the revamping work of the facilties during the period of No.1 Blast Furnace Relining in 1996. |
本系統之摘要資訊系依該期刊論文摘要之資訊為主。